Nickel concentrate from Raglan Mine in Nunavik is carried on the MV Arvik I. This vessel is capable of making eight voyages annually, carrying a maximum of 240,000 tonnes of concentrate per year.

Nickel matte from our Sudbury smelter arrives at the Port of Québec by train and is then loaded onto ships bound for our refinery in Norway.

Nickel is processed in closed facilities to minimize dust emissions. The only areas where nickel is not 100% covered are during the unloading of concentrate and loading of nickel matte. Other measures are in place to minimize potential dust emissions, including fogging systems and integrated real-time dust monitoring equipment.

  • Concentrate storage building

  • Railcar loading and unloading facilities

2025-26 Unloading Calendar

Unloading nickel concentrate from Raglan Mine at the Port of Québec.

 
Voyage Start Finish Number of days
1 June 21, 2025 June 26, 2025 5
2 July 24, 2025 July 29, 2025 5
3 August 28, 2025 September 2, 2025 5
4 October 3, 2025 October 8, 2025 5
5 November 13, 2025 November 18, 2025 5
6 December 18, 2025 December 26, 2025 8
7 February 3, 2026 February 9, 2026 6
8 March 13, 2026 March 19, 2026 6

 

The dates above may change due to unforeseen circumstances.

2025 Loading Calendar

Loading nickel matte from the Sudbury Smelter at the Port of Québec.

 
Voyage Start Finish Number of hours
10 August 14, 2025 August 14, 2025 11
11 September 6, 2025 September 6, 2025 12
12 September 17, 2025 September 17, 2025 6

 

The dates above may change due to unforeseen circumstances.

Volumes of nickel transiting through the port

Since 2019, Glencore’s nickel volumes transiting through the Port of Québec have remained relatively stable year after year.

Year Concentrate (tonnes) Matte (tonnes)
2019 217,224.21 119,550.62
2020 217,790.37 133,266.91
2021 199,700.15 123,349.44
2022 150,128.74 117,400.91
2023 202,232.41 121,945.32
2024 202,350.67 102,903.63
2025 (August) 124,453.94 58,513.32