Studies Included in the EIA Report :
- Asbestos Management Program/Survey, Glencore, 2016-on- going
- Ecological Risk Assessment, Off-Site Areas Near Smelter, Intrinsik, 2013
- Marine Ecological Risk Assessment, Intrinsik/Minnow, 2015
- Hydrogeological Study and Data Gap Assessment, GHD, 2020
- NORM and Hazardous Materials Survey Report, GHD, 2020
- Closure Plan – Prefeasibility Study 2019 Update, GHD, 2020
Additional Studies to be Completed :
- Water Treatment Trade-off Study (January 2021 Start)
- Cover Material Study (January 2021 Start)
- Additional Chaleur Bay Ecological Study (5 years post closure)
- Off-site terrestrial and freshwater sampling update (In Progress)
- Archaeological Impact Assessment (On-going)
- Wetlands Delineation Survey (On-going)